QP Services completed the annual assessment of 400,000 linear feet of pipe ranging in size from 6 to 24 inches. The project consisted of cleaning sewer pipes with high-pressure water blasting. CCTV was used to assess the flow of the pipe, including pipe condition, flow, and GPS verification.