Lead Service Replacement, Denver Water, Denver, CO

Planned lead service line replacements for Denver Water. The project included:

  • Approximately 6,300 linear feet of 8-inch waterline in a neighborhood rehabilitation on Pearl Street between Alameda and 3rd and at Lowell Boulevard and Pimlico
  • Approximately 14 EA water main tie-ins to the existing waterline
  • 56 EA copper water service changeovers
  • 73 EA removal and replacements of lead service lines.
  • Multiple types of riprap

2019 | $1.7 million